The primary objectives of the Payload Crew Activity Planning Integration task were to: (1) Determine feasible, cost-effective payload crew activity planning integration methods. (2) Develop an implementation plan and guidelines for payload crew activity plan (CAP) integration between the JSC Orbiter planners and the Payload Centers. Subtask objectives and study activities were defined as: (1) Determine Crew Activity Planning Interfaces. (2) Determine Crew Activity Plan Type and Content. (3) Evaluate Automated Scheduling Tools. (4) Develop a draft Implementation Plan for Crew Activity Planning Integration. The basic guidelines were to develop a plan applicable to the Shuttle operations timeframe, utilize existing center resources and expertise as much as possible, and minimize unnecessary data exchange not directly productive in the development of the end-product timelines.


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    Payload Crew Activity Planning Integration. Task 2: Inflight Operations and Training for Payloads


    Contributors:
    F. R. Hitz (author)

    Publication date :

    1976


    Size :

    78 pages


    Type of media :

    Report


    Type of material :

    No indication


    Language :

    English