The purpose of the report is to determine the effect on the proposed navigation project in the Upper Columbia area of adopting the revised procedures. The report is useful to interested parties in further consideration of the definite value of extending navigation on the Upper Columbia River and in further consideration of the operational significance of the revised procedures for evaluating water resource projects.
The Upper Columbia Navigation Proposal
1970
139 pages
Report
No indication
English
Civil Engineering , Hydrology & Limnology , Domestic Commerce, Marketing, & Economics , Water resources , Project planning , Navigation , Columbia River , Inland waterways , Benefit cost analysis , Economic factors , Cargo transportation , Income , Environmental impacts , Social effect , Graphs(Charts) , Tables(Data) , Standards , Washington(State) , Evaluation
Eurocontrol Navigation System Proposal
Emerald Group Publishing | 1962
Columbia River regulation to aid navigation
Engineering Index Backfile | 1946
|Navigation Message Correction Tables: A Proposal
British Library Conference Proceedings | 1995
|Hydraulic design of Columbia River basin navigation locks
Engineering Index Backfile | 1958
|Proposal of Navigation Message Format for UAV Pseudolite Navigation System
British Library Conference Proceedings | 2007
|