An investigation was conducted on a 1:55.5-scale hydraulic model to obtain data from which competitive designs could be determined for the repair of the damaged breakwater at Nawiliwili Harbor, Island of Kauai, Hawaii. Proposed designs involved protective cover layers of either salvaged quarrystone, tetrapod, or tribar armor units.


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    Designs for Rubble-Mound Breakwater Repairs Nawiliwili Harbor, Nawiliwili, Hawaii. Hydraulic Model Investigation


    Publication date :

    1960


    Size :

    72 pages


    Type of media :

    Report


    Type of material :

    No indication


    Language :

    English




    Nawiliwili Breakwater Stability Study, Nawiliwili Harbor, Kauai, Hawaii: Hydraulic Model Investigation

    Markle, Dennis G. / Herrington, C. Ray. / United States. Army. Corps of Engineers. Pacific Ocean Division. | HENRY – Federal Waterways Engineering and Research Institute (BAW) | 1983

    Free access

    Stability Tests of Nawiliwili Breakwater Repair

    Davidson, D. Donald. / United States. Army. Corps of Engineers. Charleston District. | HENRY – Federal Waterways Engineering and Research Institute (BAW) | 1978

    Free access



    Stability of Rubble-Mound Breakwater, Maalaea Harbor, Maui, Hawaii: Hydraulic Model Investigation

    Carver, Robert D. / Markle, Dennis G. / United States. Army. Corps of Engineers. Baltimore District. | HENRY – Federal Waterways Engineering and Research Institute (BAW) | 1981

    Free access