Problem Introduction: 1. Prevent Cold Plate Damage in Space Shuttle. 1a. The number of cold plate problems had increased from an average of 16.5 per/year between 1990 through 2000, to an average of 39.6 per year between 2001through 2005. 1b. Each complete set of 80 cold plates cost approximately $29 million, an average of $362,500 per cold plate. 1c It takes four months to produce a single cold plate. 2. Prevent Cold Plate Damage in Future Space Vehicles.
Avionics Box Cold Plate Damage Prevention
2012
16 pages
Report
No indication
English
Avionics Box Cold Plate Damage Prevention
NTRS | 2011
|Avionics Box Cold Plate Damage Prevention
NTRS | 2012
|Avionics Box Cold Plate Damage Prevention
NTIS | 2011
|Avionics box cold plate damage prevention
IEEE | 2012
|Avionics: Listing manufacturers of avionics
Online Contents | 1996