This project addressed selected logistic support requirements needed to sustain SH-2F helicopters aboard the new class ship, Guided Missile Frigate (FFG-7). The study identified and documented air/ship interface requirements, ground support equipment, test equipment requirements, packup kit range and depth, weight and cube of spares and repair parts, Individual Material Readiness List, mooring aids, and equipment (Allowance Equipage List), and recommended additional evaluation of a flight deck communication system (MAGnetic Induction Communication). A Logistic Support Conference defined logistic issues requiring resolution. The study group, coordinated by the NAILSC team, proposed and assigned action on each item. (Author)


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    Guided Missile Frigate (FFG-7) Air Detachment Requirements


    Contributors:

    Publication date :

    1976


    Size :

    173 pages


    Type of media :

    Report


    Type of material :

    No indication


    Language :

    English