This report documents the current facility design philosophy for the Tank Waste Remediation System (TWRS) process support and infrastructure definition. The Tank Waste Remediation System Facility Configuration Study (FCS) initially documented the identification and definition of support functions and infrastructure essential to the TWRS processing mission. Since the issuance of the FCS, the Westinghouse Hanford Company (WHC) has proceeded to develop information and requirements essential for the technical definition of the TWRS treatment processing programs.


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    Facility design philosophy: Tank Waste Remediation System Process support and infrastructure definition


    Contributors:

    Publication date :

    1995


    Size :

    538 pages


    Type of media :

    Report


    Type of material :

    No indication


    Language :

    English






    BASIC UNIT, INFRASTRUCTURE FACILITY AND INFRASTRUCTURE SYSTEM

    MAURUS TOBIAS | European Patent Office | 2021

    Free access

    BASIC UNIT, INFRASTRUCTURE FACILITY AND INFRASTRUCTURE SYSTEM

    MAURUS TOBIAS | European Patent Office | 2021

    Free access

    INFRASTRUCTURE FACILITY

    SUZUKI ATSUMI | European Patent Office | 2021

    Free access