This report describes the performance of portions of the East Los Angeles interchange as affected by changes in striping of the merging areas. This interchange is one of the busiest in California with an ADT of about 320,000 vehicles and has experienced operating difficulties resulting in large delays to traffic using the interchange. (BPR abstract)


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    East Los Angeles Interchange Operation Study - November 1966


    Contributors:
    L. Newman (author) / R. T. Johnson (author)

    Publication date :

    1967


    Size :

    56 pages


    Type of media :

    Report


    Type of material :

    No indication


    Language :

    English