The Army Service Test Procedure describes test methods and techniques for evaluating the performance and characteristics of Trailer Vehicles (for Guided Missile Launching Control Station), and for determining their suitability for service use by the U. S. Army. (Author)
Trailer, Guided Missile Director of Launching Control Station
1970
24 pages
Report
No indication
English
Guided Missile Launching System
NTIS | 1966
|NTIS | 1970
Loader Mechanism for Guided Missile Launching System
NTIS | 1965
|A Guided Missile Explodes in a Launching Silo
NTIS | 1981
|