Contents: Vibration Ground Vehicular Test (Operating); Leakage (Immersion) Test (Non-Operating); Shock, Bench Handling Test (non-Operating); Shock Test, Ballistic (Non-Operating); Shock, Drop Test (Non-Operating); Vibration, Vehicular Bounce (Non-Operating); Bounce, Loose Cargo (Non-Operating); and Temperature-Altitude Test (Operating).


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    Contractor Evaluation Report for RAdio Set AN/URC-78 (XE-2)/V (Test Data Sheets) URC-D002. Volume III. Appendix A (Continued)


    Publication date :

    1975


    Size :

    354 pages


    Type of media :

    Report


    Type of material :

    No indication


    Language :

    English