Contents: Vibration Ground Vehicular Test (Operating); Leakage (Immersion) Test (Non-Operating); Shock, Bench Handling Test (non-Operating); Shock Test, Ballistic (Non-Operating); Shock, Drop Test (Non-Operating); Vibration, Vehicular Bounce (Non-Operating); Bounce, Loose Cargo (Non-Operating); and Temperature-Altitude Test (Operating).
Contractor Evaluation Report for RAdio Set AN/URC-78 (XE-2)/V (Test Data Sheets) URC-D002. Volume III. Appendix A (Continued)
1975
354 pages
Report
Keine Angabe
Englisch