This document describes the outline proposed by the SAIC team for the RRS System Specification document. This document will be updated periodically during the course of the study, providing design insights and information pertinent to the various elements of the RRS design. The RRS System Specification document organization is shown schematically. The RRS Vehicle (RRV), Payload Module (PM), and the Operations Support (OS) are the three main segments of the overall system for which formal interface control will exist. The number and relationship of these interface specifications to the main segments is also shown.
Outline for Reusable Reentry Satellite System Specification, Volumes 1 - Volume 9
1989
54 pages
Report
No indication
English