The FY05 CCDoTT program addressed eight technical development projects and two administrative tasks within the Agile Port and High Speed Ship technology sector. The FY05 Final Summary Report Volume I covering seven of the eight technical projects was submitted on July 2, 2008. Project 05-7, the Pacific Northwest Agile Port System Demonstration, became delayed due to changing requirements directed by the United States Transportation Command. Projects 05-1 and 05-2 provided support to Project 05-7 and were extended for the duration of the project. This report summarizes the results of the remaining three projects in the FY05 program cycle, in particular the PNW Agile Port System Demonstration, a system of moving freight that could result in a 300% improvement in container throughput and terminal efficiency.
Agile Port and High Speed Ship Technologies
2009
27 pages
Report
No indication
English
Marine & Waterway Transportation , Logistics Military Facilities & Supplies , Marine terminals , Ports(Facilities) , Shipping containers , Efficiency , Cargo , Project management , Throughput , Demonstrations , Transitions , Aps(Agile port system) , Inland ports , Agile port , Technology transition , Jctd(Joint capability technology demonstration) , Iic(Intermodal interface center) , Dedicated freight corridor , Technical coordination , Sm21(Strategic mobility) , Pacific northwest
High-Speed Sealift-Agile Port Operational Concept
Online Contents | 1998
|High-Speed Sealift/Agile Port Operational Concept
Transportation Research Record | 1998
|High-Speed Sealift/Agile Port Operational Concept
British Library Conference Proceedings | 1998
|