This manual provides preliminary operating and maintenance instructions for erection of the XSM-65 B, C, and D series missiles in the tower, with holddown and release cylinders installed on the launcher. The missile and the attached trailer are erected in the tower as a unit; the trailer mates with the erector, and the missile mates with the launcher. Erection is concerned with the operation of all equipment required to raise and hold the missile in the launching position. (Author)


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    Preliminary Operating and Maintenance Instructions for Erecting Missile in Tower (With 7-89366 Holddown and Release Cylinders Installed on the Launcher)


    Publication date :

    1959


    Size :

    18 pages


    Type of media :

    Report


    Type of material :

    No indication


    Language :

    English




    Payload Holddown and Release Mechanism

    D. Chaput / M. Visconti / M. Edwards et al. | NTIS | 1994


    Payload holddown and release mechanism

    Chaput, Dale / Visconti, Mark / Edwards, Michael et al. | NTRS | 1994



    Payload Holddown and Release Mechanism

    Chaput, D. / Visconti, M. / Edwards, M. et al. | British Library Conference Proceedings | 1994


    Holddown arm release mechanism used on Saturn vehicles

    Phillips, J. D. / Tolson, B. A. | NTRS | 1975