The purpose of the report on the riser system is to describe the present status and preferred design, to outline the plan for future development, and to summarize all work which has been done to date. The purpose of the riser system is to provide a positive means of re-entering the hole, a means of returning drilling fluids and bit cuttings to the vessel, and a means of supporting the drill string if the vessel must move off station. (Author)
Project Mohole Riser System Status Report
1963
203 pages
Report
No indication
English
Industrial & Mechanical Engineering , Geology & Geophysics , Marine Engineering , Stabilized platforms , Drilling , Pipes , Mohorovicic discontinuity , Design , Stresses , Supports , Disconnect fittings , Couplings , Buoys , Gas generating systems , Suspension devices , Corrosion inhibition , Installation , Mechanical drawings , Marine engineering , Mohole project , Riser systems , Casing
Project Mohole Riser System Stress Analysis
NTIS | 1966
|Project Mohole Ship Motion Study
NTIS | 1962