The requirements and trade-off studies used in the architectural concept design phase of the MECB-RSS1 satellite are presented. The main necessary requirements are presented with four satellite configurations designed to meet all of them. The desirable requirements are presented with the trade-off methodology used to choose between those different configurations. The present design phase configuration is also shown.


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    Requirements and Trade-off Studies in Satellite Mechanical Architecture


    Contributors:

    Publication date :

    1990


    Size :

    7 pages


    Type of media :

    Report


    Type of material :

    No indication


    Language :

    English




    Risk/Requirements Trade-off Guidelines for Low Cost Satellite Systems

    Cornford, Steven L. / Man, Kin F. | NTRS | 1996


    Resource Prospector Lander: Architecture and Trade Studies

    Moore, Josh / Calvert, Derek / Frady, Greg et al. | NTRS | 2014


    STEREO observatory trade studies and resulting architecture

    Driesman, A.S. / Ballard, B.W. / Rodriguez, D.E. et al. | IEEE | 2001


    A trade-off model for satellite support studies

    KING, EDGAR / MORICAL, LOWELL / DILLARD, MICHAEL | AIAA | 1988


    Satellite Orbit Considerations for a Global Change Technology Architecture Trade Study

    E. F. Harrison / G. G. Gibson / J. T. Suttles et al. | NTIS | 1991