The requirements and trade-off studies used in the architectural concept design phase of the MECB-RSS1 satellite are presented. The main necessary requirements are presented with four satellite configurations designed to meet all of them. The desirable requirements are presented with the trade-off methodology used to choose between those different configurations. The present design phase configuration is also shown.
Requirements and Trade-off Studies in Satellite Mechanical Architecture
1990
7 pages
Report
No indication
English