A visit was made to Amberley Airbase between the 6th and 9th of September to consult with RAAF staff on current procedures and problems involved in the maintenance and repair of F-lll honeycomb panels. In conjunction with these discussions, a review of the current methods being used for honeycomb repair procedures was undertaken. The following report summaries the methods being used for repairs and the relevant reference documents. Also detailed are the major problems being encountered in these repairs and future problems which may arise as a result of the current status being maintained during the service life of the F-lll.


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    F-111 Bonded Panel Repair Status


    Contributors:
    A. N. Rider (author)

    Publication date :

    1999


    Size :

    37 pages


    Type of media :

    Report


    Type of material :

    No indication


    Language :

    English




    Composite bonded repair of cracked panel subject to acoustic fatigue

    Callinan, R.J. / Galea, S.C. / Sanderson, S. | Tema Archive | 1997


    Composite bonded repair method

    URBAN MICHAEL R | European Patent Office | 2019

    Free access

    COMPOSITE BONDED REPAIR METHOD

    URBAN MICHAEL R | European Patent Office | 2023

    Free access

    COMPOSITE BONDED REPAIR METHOD

    URBAN MICHAEL R | European Patent Office | 2015

    Free access

    COMPOSITE BONDED REPAIR METHOD

    URBAN MICHAEL R | European Patent Office | 2015

    Free access