An overview of electrical power requirements for each mission of a baseline and alternate plan for space activities in the 1990-2035 timeframe is presented. The specific missions included low earth orbit (LEO), geosynchronous earth orbit (GEO), lunar, Mars, and asteroid related projects.
Power System Requirements
1992
8 pages
Report
No indication
English
NTRS | 1992
|Bimodal power and propulsion system requirements
AIAA | 1995
|Engineering Index Backfile | 1946
|Emerald Group Publishing | 1946
|