The main objective of this study (PISC III, action 5) was the experimental evaluation of the performance of methods used in in-service inspection of steam generator tubes. The study was organized by the Joint Research Center of the European Community (JRC).
Hoeyrystimien Testaustekniikoiden Vertailu PISC-Projektissa (Comparison of Steam Generator Methods in PISC)
1996
44 pages
Report
No indication
English
Inspection Capability of Steam Generator Tubes as Resulting from the Pisc III Exercise
British Library Conference Proceedings | 1994
|PISC Data Bases Available for Technical Justification of the Capability of Inspection Procedures
British Library Conference Proceedings | 1994
|Conclusions of the PISC III Action on the Inspection of Dissimilar Metal Welds
British Library Conference Proceedings | 1994
|