The purpose of this report is to provide the Naval Electronic Systems Command a summary of the technical progress. Instructions pertaining to the installation of modification kits were written, approved, and distributed in the form of AN/SSC-3 Maintenance Bulletins. Problem reports were received and action initiated to correct the problems. The mean-time-between-failure (MTBF) and the mean-time-to-repair (MTTR) are calculated and presented in this report. The information tabulated in the logs is still incomplete, and in many instances prevented a thorough analysis. (Author)


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Matnet, an experimental Navy shipboard satellite communications network

    Evenckik, L.N. / McNeill, D.A. / Bressler, R.D. et al. | Tema Archive | 1982



    Communications Issues in Shipboard Telemedicine

    A. D. Ramirez / S. D. Russell / C. B. Phillips et al. | NTIS | 2001



    Numerical design of shipboard communications antenna

    Katulski, R.J. | Tema Archive | 1991