Underwater simulations of EVA contingency operations such as manual jettison, payload disconnect, and payload clamp actuation were used to define crew aid needs and mockup pecularities and characteristics to verify the validity of simulation using the trainer. A set of mockup instrument pointing system tests was conducted and minor modifications and refinements were made. Flight configuration struts were tested and verified to be operable by the flight crew. Tasks involved in developing the following end items are described: IPS gimbal system, payload, and payload clamp assembly; the igloos (volumetric); spacelab pallets, experiments, and hardware; experiment, and hardware; experiment 7; and EVA hand tools, support hardware (handrails and foot restraints). The test plan preparation and test support are also covered.


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    Design, Fabrication and Delivery of a Spacelab Neutral Buoyancy Instrument Pointing System (IPS) Mockup


    Contributors:

    Publication date :

    1984


    Size :

    66 pages


    Type of media :

    Report


    Type of material :

    No indication


    Language :

    English