Stress Analyses were performed on the following aircraft modifications: AT1108 Antenna Installation, HF Longwire Installation, UPS-192 Antenna Installation, 437S-1C Antenna Installation, and SATCOM Antenna Installation. The detailed conclusions of each of the topics above are contained after each sub-analysis. However, the general conclusion is that each of the subject modifications in no way impare the airworthiness of the aircraft in that the aircraft strength is equal to or greater than the original unmodified strength. (Author)


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    Stress Analysis of Aircraft Modifications (C-141B Aircraft). Joint Airborne Communications Center/Command Post (JACC/CP) Provisions


    Contributors:
    D. B. Ragan (author)

    Publication date :

    1980


    Size :

    159 pages


    Type of media :

    Report


    Type of material :

    No indication


    Language :

    English






    C-141B StarLifters repaired

    Online Contents | 1994



    Aircraft seat deployable bridge table, mounting provisions, and storage provisions

    MCKEE ERIC M / SMITH BRADLEY J / BOWDEN ROHN A et al. | European Patent Office | 2021

    Free access