The primary objective of the cost study was to compare cost of the new design concept of the AN/PPS-18 (XN-1) with the existing AN/PPS-6. An additional goal was to study various overhaul policies to determine the least cost maintenance policy for the new design. (Author)
Life Cycle Cost Study (Cost of Ownership Report) for An/Pps-18 (Xn-1) Ultra Reliable Radar
1970
54 pages
Report
No indication
English
Standard Electronic Module Radar Life Cycle Cost Study
NTIS | 1977
|AIAA | 2005
|British Library Conference Proceedings | 1993
|