Before conducting the missile composite checkout, successful performance of each individual system installed on the missile must be determined. The following is a list of the procedures used for acceptance testing of each system: Azusa system; Electrical system; Flight control system; Inertial guidance system; Instrumentation beacon system; Acoustica propellant utilization system; Propulsion system, Range safety command system; and Telemetry system. (Author)
Factory Acceptance Testing of Missile 10F
1961
72 pages
Report
No indication
English
Factory Acceptance Testing of Missile 1F
NTIS | 1961
Factory Acceptance Testing of Missile 140D
NTIS | 1961
Factory Acceptance Testing of Missile 118D
NTIS | 1961
Factory Acceptance Testing of Missile 119D
NTIS | 1961
Factory Acceptance Testing of Missile 57E
NTIS | 1961