Before conducting the missile composite checkout, successful performance of each individual system installed on the missile must be determined. The following is a list of the procedures used for acceptance testing of each system: Azusa system; Electrical system; Flight control system; Inertial guidance system; Instrumentation beacon system; Acoustica propellant utilization system; Propulsion system, Range safety command system; and Telemetry system. (Author)