The approaches adopted for the tasks of the Hipparcos satellite assembly, concerning performance and functional verification, are examined. The philosophy of the satellite model development is explained. The industrial development of the Hipparcos satellite and the activities of the test program are described. The purposes and the management of the verification program are reviewed. The launch range operations, which include satellite preparation, satellite filling and integration and combined launcher/satellite operations, are summarized.
Assembly, Integration, and Verification
1989
5 pages
Report
No indication
English
Assembly, Integration and Verification
Wiley | 2011
|British Library Conference Proceedings | 2019
|ANTARES VTB integration and verification results
IEEE | 2015
|Space station integration and verification concepts
Tema Archive | 1986
|