Southern Maryland Electric Cooperative, Inc. (SMECO) is proposing to construct a new 230 kV double circuit transmission line from SMECO’s Holland Cliff switching station in northern Calvert County, Maryland, to the SMECO Hewitt Road switching station in St. Mary’s County, Maryland. Also proposed as part of this project is the southern Calvert County 230/69 kV switching station that would be connected to this line and would be located between the Holland Cliff and Hewitt Road switching stations in the vicinity of the existing SMECO Calvert Cliffs 69 kV transmission line tap near the intersection of Pardoe Road and Maryland State Route 4. The new 230 kV Holland Cliff to Hewitt Road transmission line and associated southern Calvert County 230/69 kV switching station, hereafter referred to as “the Project”, is being proposed to meet growth in electrical energy demand and improve system reliability within SMECO’s service area.
Holland Cliff-Hewitt Road 230 kV Transmission Line Project Scoping Meeting Report
2010
53 pages
Report
No indication
English
Electric Power Transmission , Electric Power Production , Economic & Community Development , Transmission lines , Electrical utilities , Energy demands , Double circuits , Maryland , Electrical energy , Rural development , Switching stations , Alternatives , Scoping report meetings , Southern Maryland Electric Cooperative (SMECO) , Holland Cliff Switching Station , Hewitt Road Switching Station
Orange Line Extension Project. Scoping Report
NTIS | 2011
Online Contents | 2009
|Engineering Index Backfile | 1901