This document details the procedures to be followed for flow stoppage incidents under corrective action procedure number 5 (Rear gunbarrel removal and dummy gunbarrel installation). (BN)


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    Tube 3560 KW flow stoppage incident corrective action procedure No. 10. Rear gunbarrel removal and dummy gunbarrel installation on channel 3560


    Contributors:

    Publication date :

    1968


    Size :

    9 pages


    Type of media :

    Report


    Type of material :

    No indication


    Language :

    English




    Nr. 3560

    DataCite | 1913



    Convoluted Intake Distortion Measurements Using Stereo Particle Image Velocimetry (AIAA 2016-3560)

    Gil-Prieto, Daniel / Zachos, Pavlos / MacManus, David G. et al. | British Library Conference Proceedings | 2016



    Experimental Measurements of Fuel Savings During Aircraft Wake Surfing (AIAA 2018-3560)

    Hanson, Curtis E. / Pahle, Joe / Reynolds, James R. et al. | British Library Conference Proceedings | 2018