The objective of this Florida Test Procedure is to check LO2 system temperatures and level control by filling the missile LO2 tank. This includes the following phases: (1) Chill down facility LO2 fill line. (2) Fill missile to prescribed level. (3) Checkout subcooled topping system.
LO2 Tanking Test Procedure
1959
27 pages
Report
No indication
English
Online Contents | 2001
Missile Fuel Tanking and Leak Check Procedure
NTIS | 1958
|NTRS | 1979
|STS-133/ET-137 Tanking Test Photogrammetry Assessment
British Library Conference Proceedings | 2012
|