The proposal concerns construction and present routing of State Route 360 (Superstition Freeway). The roadway will be constructed to freeway standards from its present terminus at Rural Road in Tempe and will continue eastward for 20 miles in Maricopa County and five miles in Pinal County to a terminus with U.S. Highway 60-80-89 southeast of Apache Junction. When completed, Route 360 will be about 27 miles in length including the two-mile segment already completed in Tempe. Initial construction of the project will provide two traffic lanes in each direction separated by a 46-foot-wide median to Power Road and an 84-foot median eastward to the project terminus. In the undeveloped corridor, existing desert vegetation along the roadway margins will be left intact. Landscaping in urban areas will be similar to that on the existing portion of route 360. Right of way width will vary from a base of 300 to 500 feet with some additional flaring at traffic interchanges. Environmental impacts are described.


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    State Route 360, Superstition Freeway, Project F-028-1-201, Junction I-10-Pinal County Line, Maricopa County, Project F-028-1-202, Maricopa County Line, Junction U.S 60, Pinal County, Arizona


    Publication date :

    1973


    Size :

    364 pages


    Type of media :

    Report


    Type of material :

    No indication


    Language :

    English