The Hanford Federal Facility Agreement and Consent Order (also known as the Tri-Party Agreement), established several milestones associated with the Initial Single-Shell Tank Retrieval System (ISSTRS). It also established that the scope of ISSTRS is the retrieval of a complete tank farm or an equivalent number of tanks. This study selected the single- shell tanks to be included in the ISSTRS work scope. This study determined that the ISSTRS work scope should consist of four tanks located in the A, AX, and C, tank farms. One of the tanks (Tank 241-AX-103) will be a salt cake retrieval demonstration tank. The other three (Tanks 241 -A-1 02, 241 -C-1 03, and 241-C-105) are 100-series tanks containing high interim storage risk, high long-term hazard waste and are assumed not to be leaking.


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    Initial single-shell tank retrieval system tank selection


    Contributors:

    Publication date :

    1996


    Size :

    49 pages


    Type of media :

    Report


    Type of material :

    No indication


    Language :

    English