The 2008 National Defense Authorization Act requires the Secretary of the Air Force to task a federally funded research and development center to conduct an engineering analysis on modifying KC-135R and KC-10 tanker aircraft with winglets and submit a report to the congressional defense committees by May 1, 2009. This research summarizes the main issues that decision makers should consider in the investment in a winglet modification program. The factors that should be included in any decision, such as fuel costs, aircraft utilization, and life-cycle costs are enumerated. Using historical flight data from Air Mobility Command's (AMC) Global Decision Support System-2 and fuel reports from one of AMC's super tanker wings, a cost-benefit analysis is developed to aid in the decision making process. Although the addition of winglets to the KC-135R could reduce future fuel expenditures between $177 million and $1.1 billion over the modification costs by 2042, the second-order effects to current infrastructure may diminish any potential savings achieved by the modification. Further analysis is required on a location-by-location basis to obtain the actual costs of these second-orders effects before any modification decision is made.


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Fuel savings on missed approach through aircraft reinjection

    Carmona, María / Casado González, Rafael / Bermúdez, Aurelio et al. | Emerald Group Publishing | 2024

    Free access



    Fuel savings through machinery automation

    Haaland, E. / Sivertsen, O. | Tema Archive | 1976


    Experimental Measurements of Fuel Savings During Aircraft Wake Surfing

    Hanson, Curt / Pahle, Joe / Reynolds, James et al. | NTRS | 2018