An engineering baseline definition is given of an urban fast transit link transportation system consisting of large vehicles riding on rubber wheels beneath a flexible, cable-suspended steel guideway. Tower spacing is 1/4 mile. A driver is used. Stations are on line. Electric propulsion is used. Application to an airport is discussed. (UMTA abstract)


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite