The Cleveland Hopkins Airport Access Study consisted of an analysis of the impact of the rapid rail extension to Hopkins Airport. A survey of airport users at Hopkins Airport was conducted before the opening of the Cleveland Transit System rail transit service to the airport (Phase I) and another survey was conducted one year later (Phase II), after the rail rapid service was opened. The data from these surveys were compared to determine the effect of the new rail transit service on the choice of travel mode by the different groups of airport users. This report documents the procedures used in the surveys for both Phase I (before surveys) and Phase II (after surveys). (Author)


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    Survey Procedures, Cleveland-Hopkins Airport Access Study


    Publication date :

    1970


    Size :

    126 pages


    Type of media :

    Report


    Type of material :

    No indication


    Language :

    English