This report presents findings on the past, present, and expected future performance and rehabilitation needs of the pavement on the Interstate I-80 highway corridor that transverses northern Illinois. The results presented herein cover the time period from initial construction in the 1960's through 2015. The objective of this study is to provide information for IDOT management and engineers to assist in maintaining this critical east-west highway in operating condition and to determine the funding needed for long-term planning and programming. The results are also useful in planning a future rehabilitation strategy to minimize disruption to the traveling public.


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    Interstate 80 Pavement Rehabilitation Corridor Study


    Contributors:
    C. J. Wilson (author) / M. I. Darter (author)

    Publication date :

    1999


    Size :

    42 pages


    Type of media :

    Report


    Type of material :

    No indication


    Language :

    English