This document presents a definition of tank turnover. Also, DOE and PC responsibilities; TWRS DST permitting requirements; TWRS Authorization Basis (AB) requirements; TWRS AP Tank Farm operational requirements; unreviewed safety question (USQ) requirements are presented for two cases (i.e., tank modifications occurring before tank turnover and tank modification occurring after tank turnover). Finally, records and reporting requirements, and documentation which will require revision in support of transferring a DST in AP Tank Farm to a privatization contractor are presented.
Feed tank transfer requirements
1998
98 pages
Report
No indication
English
Tank Farms Technical Safety Requirements
NTIS | 2003
|TANK CLEANING - Oreco meets ATEX requirements
Online Contents | 2006
International harmonization of multimodal tank requirements
British Library Conference Proceedings | 1993
|Turbomachinery for total tank power requirements
Automotive engineering | 1986
|