The report summarizes the results of the survey of the North Central Expressway automobile and transit panelists conducted in May 1992. The results of the survey indicate that travel conditions in the corridor have not deteriorated significantly since the start of Expressway construction south of I-635. Details regarding the survey analysis and results are presented herein.


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    U.S. 75 North Central Expressway Reconstruction: Northwest Highway Screen Line Automobile and Transit User Panels, May 1992 Survey Results


    Contributors:

    Publication date :

    1992


    Size :

    44 pages


    Type of media :

    Report


    Type of material :

    No indication


    Language :

    English