The work performed under this contract consisted of the following; integrate, calibrate, and test, GFE range safety radar tracking beacon and parachute recovery systems; design and develop special devices as required, operate and maintain GFE telemetry station to support telemetry operations at WSMR, New Mexico, and calibrate equipment and perform analyses for air sampling balloon flights conducted at Holloman AFB, New Mexico. (Author)
Sounding Rocket and Balloon Systems Support
1979
8 pages
Report
No indication
English
Sounding Rocket and Balloon Systems Support
NTIS | 1976
|Swedish Sounding Rocket and Balloon Programme
NTIS | 1991
|Norwegian Sounding Rocket and Balloon Programme
NTIS | 1991
|Esrange: Sounding Rocket and Balloon Facility
NTIS | 1991
|The Norwegian Sounding Rocket and Balloon Program
British Library Conference Proceedings | 2001
|