The Space Launch System (SLS) Program (Fig. 1) completed several significant production milestones in 2018 for its first mission and is poised for greater accomplishments in 2019. With manufacturing and hardware installation complete, Boeing completed the core stage forward join and shipped the liquid hydrogen tank structural test article to Marshall Space Flight Center for testing. The core stage aft join and LOX tank STA are expected to be completed in 2019 on the way to final stage integration. The four EM-1 engines are poised for stage integration in 2019. The Launch Vehicle Stage Adapter completed outfitting at Marshall and will be shipped to Kennedy Space Center in 2019. All solid rocket motor segments for the EM-1 boosters are cast, inspected and ready for shipment to KSC. The Program continues to work toward first launch of the nation’s new super heavy lift deep space capability in fiscal 2020. SLS is designed, engineered and tested to launch the most challenging exploration missions, minimizing risk and providing the greatest opportunity for mission success and scientific discovery. This paper will discuss the technical and programmatic successes and challenges of the past year and look ahead to plans for 2019.


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    NASA’s Space Launch System: First Mission Hardware Nears Completion


    Contributors:
    J. Honeycutt (author) / C. Cianciola (author)

    Publication date :

    2019


    Size :

    10 pages


    Type of media :

    Report


    Type of material :

    No indication


    Language :

    English




    NASA’s Space Launch System: First Mission Hardware Nears Completion

    Honeycutt, John / Cianciola, Chris | NTRS | 2019


    NASA's Space Launch System: First Mission Hardware Nears Completion

    Honeycutt, John H. / Cianciola, Chris | AIAA | 2019


    NASA'S SPACE LAUNCH SYSTEM: FIRST MISSION HARDWARE NEARS COMPLETION

    Honeycutt, John H. / Cianciola, Chris / Blevins, John | TIBKAT | 2019