Background, requirements, system descriptions, task descriptions, activities, schedules and funding levels are presented for the Airport Surface Traffic Control (ASTC) program for the years 1972-1979. Systems, subsystems proposed concepts and equipments are to be defined and specified in a system context and will then be designed, developed, tested, and evaluated for introduction in modular fashion into the existing airport environment. Modular structure of the system will permit system configurations to be tailored to the needs of the individual airport and will permit modular expansion of either capacity or function to meet the airport's needs as they evolve with time. (Author)


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    Engineering and Development Program Plan - Airport Surface Traffic Control


    Publication date :

    1972


    Size :

    162 pages


    Type of media :

    Report


    Type of material :

    No indication


    Language :

    English







    The Airport Surface Traffic Automation Program

    Lyon, E. F. / Thompson, S. D. / Kastner, M. P. et al. | British Library Conference Proceedings | 1990


    The Airport Surface Traffic Automation Program

    Lyon, E. F. / Thompson, S. D. / Kastner, M. P. et al. | British Library Conference Proceedings | 1990