In this APS Instrumentation Initiative, 2.5-m-long and 5-m-long insertion-device x-ray sources will be built on 9 straight sections of the APS storage ring, and an additional 9 bending-magnet sources will also be put in use. The front ends for these 18 x-ray sources will be built to contain and safeguard access to these bright x-ray beams. In addition, funds will be provided to build state-of-the-art insertion-device beamlines to meet scientific and technological research demands well into the next century. This new initiative will also include four user laboratory modules and a special laboratory designed to meet the x-ray imaging research needs of the users. The Conceptual Design Report (CDR) for the APS Instrumentation Initiative describes the scope of all the above technical and conventional construction and provides a detailed cost and schedule for these activities. According to these plans, this new initiative begins in FY 1994 and ends in FY 1998. The document also describes the preconstruction R&D plans for the Instrumentation Initiative activities and provides the cost estimates for the required R&D.


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    7-GeV Advanced Photon Source Instrumentation Initiative conceptual design report


    Publication date :

    1992


    Size :

    120 pages


    Type of media :

    Report


    Type of material :

    No indication


    Language :

    English





    Status and design of the Advanced Photon Source control system

    W. McDowell / M. Knott / F. Lenkszus et al. | NTIS | 1993



    ECLSS Instrumentation Technology Development for the Space Exploration Initiative

    Diamant, Bryce L. / Bao, Jinjun / Wieland, Paul et al. | SAE Technical Papers | 1991