A proposal was made to acquire airport development land and clear zone easements; extend, light (MIRL) and mark Runway 3/21 (150' x 1000') from 7300' to 8300'; construct, light (MITL) and mark parallel taxiway (approximately 50' x 1300'); construct, light and mark holding apron (approximately 125' x 200'); relocate irrigation ditch and construct fencing. The only identifiable adverse environmental effect of the proposed project will be a slight increase in aircraft noise for the residences, schools and church located in the approach to Runway 3 due to the lowering of the glide path minimums. This increase is not considered significant. (Author)
Ogden Municipal Airport at Ogden, Utah
1971
51 pages
Report
No indication
English
Water-waste survey of Ogden, Utah
Engineering Index Backfile | 1932
|Engineering Index Backfile | 1930
Engineering Index Backfile | 1930