The Oregon Test Series II operations were conducted during the week of 12-16 March 1973. The purpose of the tests was to evaluate the feasibility of utilizing a natural shape balloon logging system in a Ship to Shore cargo transport configuration and to obtain container transport times and velocities, container positioning accuracies and the forces associated with the cable system.
Ship to Shore Oregon Test Series II Preliminary Report
1973
40 pages
Report
No indication
English
Ship to Shore Oregon Demonstration Tests
NTIS | 1972
|Engineering Index Backfile | 1957
|British Library Online Contents | 1996
SWAP: SHIP-TO-SHIP/SHORE-TO-SHORE WIRELESS ACCESS PROTOCOL
British Library Online Contents | 2005
|Online Contents | 1995
|