The project would acquire clear zone easements; extend and light runway 14/32 existing from 4500 ft. x 150 ft. to 5400 ft. x 150 ft.; construct and light partial parallel taxiway; expand parking apron and install partial taxiway lighting system. There will be a few additional business jet operations after completion of the development and some of the existing aircraft operations will be more heavily loaded with fuel resulting in a slight increase in noise pollution; however, the relative impact from this will not be significant. Air pollution from these operations will also increase very slightly, but prevailing gulf breezes will rapidly disperse this over large open bodies of water and prairie and therefore be of no significance.


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    Aransas County Airport, Rockport, Texas


    Publication date :

    1973


    Size :

    62 pages


    Type of media :

    Report


    Type of material :

    No indication


    Language :

    English