A system specification is presented for the spacecraft which forms ESA's contribution to a joint ESA/NASA Jupiter swingby out-of-ecliptic mission. The overall performance requirements are defined in terms of the primary performance requirements of the envisaged system and individual subsystems; launcher options and their performance capabilities; associated ground facilities in the time frame of interest; and other constraints as identified to date.


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    Solar out-of-Ecliptic Study. Appendix: System Specification


    Contributors:

    Publication date :

    1976


    Size :

    43 pages


    Type of media :

    Report


    Type of material :

    No indication


    Language :

    English