The report presents the results of the May 1993 survey of the automobile user panel established to assist in monitoring the traffic impacts of the North Central Expressway (NCE) reconstruction. Overall, only minimal changes in travel patterns and operating conditions were detected. Perhaps more importantly, the majority of panelists continued to believe that their travel patterns had not been impacted by construction. The few individuals who did believe they had altered their travel patterns actually reported departure times, travel times, and/or other travel characteristics in May 1993 that were different from what they reported in October 1992. In other words, panelist perceptions were consistent with their reported behavior and the changes they had made in behavior between October 1992 and May 1993.


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    U.S. 75 North Central Expressway Reconstruction: Lemmon/Oak Lawn/Peak Screen Line Automobile User Panel, May 1993 Survey Results


    Contributors:

    Publication date :

    1993


    Size :

    34 pages


    Type of media :

    Report


    Type of material :

    No indication


    Language :

    English