For abstract, see in support of the Apollo 17 prelaunch checkout and the mission. Key personnel are identified and their responsibilities are defined. The interfaces of the Mission Evaluation Team with the launch center during prelaunch testing, and with the Spacecraft Analysis and Flight Control Teams during the mission, are also explained. The plan is written in two parts. The first part defines the Mission Evaluation Team support to the Launch Center commencing with the subsystem checkout performed on the pad (Test and Checkout Procedures K-0005 for the CSM and KL-0045 for the lunar module). The second part defines the continuous support provided during the mission to the Spacecraft Analysis Room and, subsequently, to the Mission Operations Control Room at MSC. The second part will be updated about 30 days prior to the mission to reflect personnel and measurement changes. (Author)


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    Apollo 17 Mission Evaluation Plan


    Publication date :

    1972


    Size :

    79 pages


    Type of media :

    Report


    Type of material :

    No indication


    Language :

    English