The Joint Logistics Over-the-Shore (JLOTS) II joint test and evaluation project was conducted to assess the Services' current capability in Assault Follow-On Echelon (AFOE) and Logistics Over-the-Shore (LOTS) operations. This is the latest in a series of joint tests begun in 1970 to aid the development and to demonstrate container handling capability in AFOE/LOTS operations. JLOTS II was separated into three test phases. Phase I, the Deployment Test, was to assess the capability to deploy the logistics delivery equipment in merchant ships to the operating area. Phase II, the Roll-On/Roll-Off (RO/RO) Test, was to assess the capability to assemble. install, and operate an offshore RO/RO Discharge Facility and to deliver vehicular cargo ashore from merchant RO/RO vessels. Phase III, the Throughput Test, was to assess the Services' capability to install and use their delivery systems for containers, breakbulk, and bulk liquid cargo, and to define the operating performance of the combined systems in a joint test. The Deployment Test was conducted in May and July 1984. The RO/RO Test was conducted in July and September 1983. The Throughput Test is reported in three documents: A Quick Look Report; An Operational Report; and this report, the Analysis and Evaluation Report.


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    Joint Logistics Over-the-Shore II (JLOTS II). Test and Evaluation, Throughput Test


    Publication date :

    1985


    Size :

    441 pages


    Type of media :

    Report


    Type of material :

    No indication


    Language :

    English