Development of a traffic control procedure to divert vehicle groups from the federal autobahn A3. In order to prevent a complete breakdown of the traffic flow on the northern section of the federal autobahn A3 on days with heavy traffic, an additive changeable message sign system was to be developed which would permit the diversion of vehicle groups from the federal autobahn A3 (northbound traffic) at the autobahn interchange Dernbach to the autobahns A 48 and A61. The necessary apparatus and equipment for the purpose were designed, installed and tried out during the trial phases. The works include the sectors signposting, traffic sampling and the control model. Investigations on the effects of maintenance-reconstruction measures on the federal autobahn City-Ring Berlin on the traffic operation and accident occurrence.


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    Forschung Strassenbau und Strassenverkehrstechnik, Heft 329, 1981 (Research on Road Construction and Road Traffic Techniques, Vol. 329, 1981)


    Publication date :

    1981


    Size :

    177 pages


    Type of media :

    Report


    Type of material :

    No indication


    Language :

    English