Based on the positive results obtained in other mining branches by the use of trackless transport vehicles, it was intended to design a continuous and comprehensive trackless transport system from the surface to the underground mining area of Fuerst Leopold/Wulfen mine. To ensure the high financial risk to be incurred, a calculation was carried out which compared the economics of trackless transport with conventional techniques. No economic advantage of a comprehensive use of trackless transport in the Wulfen underground area could be found out. (ERA citation 13:014007)
Development of a Trackless Vehicle Transport System Continuing from the Surface Through to the Underground Mining Area. Final Report
1986
145 pages
Report
No indication
English
Mine underground trackless transport vehicle intelligent scheduling system and method
European Patent Office | 2024
|Driving safety protection device of underground trackless auxiliary transport vehicle
European Patent Office | 2020
|