Preparation of a stable production base and rational organization of centralized component overhaul processes are examined. Methods are presented for determining overhaul requirements, optimizing centralized production objects and locations, planning the production program, introducing standardized technology, and fully mechanized flow lines for group overhaul of aircraft components. (Author)


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    Organizing Centralized Aircraft Component Overhaul


    Contributors:

    Publication date :

    1975


    Size :

    235 pages


    Type of media :

    Report


    Type of material :

    No indication


    Language :

    English





    German aircraft maintenance and overhaul methods

    Lichtenwalner, J. Y. / Allied Forces, Combined Intelligence Objectives Sub-Committee | TIBKAT | 1945




    Some notes on aircraft overhaul and maintenance

    Jackson, C.H. | Engineering Index Backfile | 1952