This final technical report details the results of a preliminary Value Engineering (VE) study performed on the Heavy Expanded Mobility Tactical Truck (HEMTT). This study was performed to determine whether to proceed with the inclusion of a mandatory VE clause in the HEMTT contract, thereby making an intensive VE study of the vehicle a requirement. The results of the preliminary study indicate an intensive VE study would be inappropriate at this time. (sdw)


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    Value Engineering 'Copperhead' Evaluation of the Heavy Expanded Mobility Tactical Truck


    Contributors:
    R. Siorek (author) / J. McCutcheon (author) / W. Mackiw (author)

    Publication date :

    1988


    Size :

    64 pages


    Type of media :

    Report


    Type of material :

    No indication


    Language :

    English





    Dodge "COPPERHEAD"

    Online Contents | 1997


    Dodge Copperhead

    Online Contents | 1997


    Future Heavy Tactical Truck

    Simon, George / Stinson, Margaret / Feury, Mark et al. | SAE Technical Papers | 2001


    Future heavy tactical truck

    Feury,M. / Hale,N. / Simon,G. et al. | Automotive engineering | 2001